ELECTRICAL

Battery & UPS runtime.

Estimate backup time from battery energy, connected load, usable battery share and conversion losses.

Input guide

Use Wh/kWh from the battery label when available. Otherwise enter the complete battery pack voltage and Ah. A UPS VA rating is not battery energy.

Nominal Wh = entered Wh or voltage × Ah; hours = Wh × usable fraction ÷ [load W ÷ efficiency + battery-side idle W]

Explore unit converters →
BATTERY & UPS RUNTIME

Need help? Select ? beside an input.

?

Use Wh/kWh from the battery label when available. Otherwise enter the complete battery pack voltage and Ah. A UPS VA rating is not battery energy.

?

Nominal stored battery energy in Wh or kWh. It differs from output power in W or VA.

?

Total active power used by all connected equipment, in W or kW. Use a measured average load. VA cannot be substituted directly.

?

Percentage of nominal energy you plan to use before cutoff or reserve. 80 means 80%; use battery or system specifications, not a universal default.

?

Conversion efficiency from battery to output, as a percentage. 90 means 90%; use product data for your load.

?

Separate battery-side power used by the inverter or UPS itself, in W. Zero is allowed. Do not add it again if already accounted for in efficiency.

Use a decimal point, for example 12.5.

Estimated backup runtime
3.30275229358h

Nominal battery energy: 500 Wh

Usable energy before conversion losses: 400 Wh

Estimated battery-side power draw: 121.111111111 W

Actual backup time varies with battery condition, temperature and load. Check the manufacturer runtime data for your equipment.

Try an example
Formula and assumptions
Nominal Wh = entered Wh or voltage × Ah; hours = Wh × usable fraction ÷ [load W ÷ efficiency + battery-side idle W]

This is an energy-budget estimate, not a manufacturer runtime curve. Use nominal Wh or the complete battery pack voltage × Ah.

Series connection increases voltage, not Ah; parallel connection increases Ah, not voltage. Enter complete-pack values.

Conversion efficiency applies to connected output load. Idle power is a separate battery-side draw; do not include it twice.

Load is constant. Temperature, aging, discharge rate, chemistry and cutoff limits affect usable energy and actual runtime.

A UPS VA rating is not battery energy. Check its W/VA load limits and manufacturer runtime data for the actual equipment.

Inputs are converted to base units before calculation. Display uses 12 significant digits; accuracy depends on measurements and assumptions.

UNITNEX

Calculation report

Use your browser's print destination to print or save as PDF.

Install UnitNex

Unit converters and calculators in a dedicated app window.

Choose the install icon in Chrome’s address bar or the install option in its menu. On iPhone or iPad, open UnitNex in Safari and choose Share → Add to Home Screen.

Calculations need an internet connection.